Coolidge Generation Station / COE22
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 49.5 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-be19aa5dd2b9a73b14726a06 |
| Net Summer Capacity (MW) | 42 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-be19aa5dd2b9a73b14726a06 |
| Net Winter Capacity (MW) | 48 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-be19aa5dd2b9a73b14726a06 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 16572 |
| Entity Name | Salt River Project |
| Plant ID | 56948 |
| Plant Name | Coolidge Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Pinal |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | COE22 |
| Nameplate Capacity (MW) | 49.5 |
| Net Summer Capacity (MW) | 42 |
| Net Winter Capacity (MW) | 48 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 32.917399 |
| Longitude | -111.5033 |
| 원문 상태 | (U) Under construction, less than or equal to 50 percent complete |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:911 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:196
근거 EV-59380ef98d683c9799b45ca6자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 862a70deb0cab176405335148a3aa5fcbae8b5e05952c423c0ec23a6780d6846
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:911
근거 EV-be19aa5dd2b9a73b14726a06자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7cabb386c54179dd56ad6287e897bf7068eb0f277b9d5548f299d932b3b93dad
