POWER & FACILITY EVIDENCE

电力与设施详细依据数据库

查看公开原文中的电力对象、合同观测、设施规格及关系。

这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。

当前条件 2条 · 当前页 1–2 · 为来源记录数,并非独立设施数。

电力对象与项目 · USA · eia860

A L Pierce

发电设施 · 未确认

指标或条件原文数值口径、范围及阶段
Grid Voltage (kV)115 kV原始来源列定义 · 发电厂 · 未确认
基准日期 2025
依据 EV-49eae925f921bf9a0b62a10f
原始来源详细字段
原始来源字段公开数值或条件
Utility ID66605
Utility NameMPH AL Pierce, LLC
Plant Code6635
Plant NameA L Pierce
Street Address195 East Street
CityWallingford
StateCT
Zip6492
CountyNew Haven
Latitude41.44823
Longitude-72.834884
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Name of Water SourceMunicipality
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerTown of Wallingford - (CT)
Transmission or Distribution System Owner ID20038
Transmission or Distribution System Owner StateCT
Grid Voltage (kV)115
Energy StorageN
Natural Gas Pipeline Name 1Algonquin Gas Transmission Company
Natural Gas StorageN
Liquefied Natural Gas StorageN
坐标精度source_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:2250

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:2250

依据 EV-49eae925f921bf9a0b62a10f
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a4e9c883ca002bff91289f2e26fe799954bbe9b01dee1b59f45478a1457c492d

使用条件 US government public domain

来源各时点记录 · USA · eia860

A L Pierce

发电厂 · 未确认

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID66605
Utility NameMPH AL Pierce, LLC
Plant Code6635
Plant NameA L Pierce
Street Address195 East Street
CityWallingford
StateCT
Zip6492
CountyNew Haven
Latitude41.44823
Longitude-72.834884
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Name of Water SourceMunicipality
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerTown of Wallingford - (CT)
Transmission or Distribution System Owner ID20038
Transmission or Distribution System Owner StateCT
Grid Voltage (kV)115
Energy StorageN
Natural Gas Pipeline Name 1Algonquin Gas Transmission Company
Natural Gas StorageN
Liquefied Natural Gas StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:2250

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:2250

依据 EV-49eae925f921bf9a0b62a10f
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a4e9c883ca002bff91289f2e26fe799954bbe9b01dee1b59f45478a1457c492d

使用条件 US government public domain