POWER & FACILITY EVIDENCE

电力与设施详细依据数据库

查看公开原文中的电力对象、合同观测、设施规格及关系。

这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。

当前条件 2条 · 当前页 1–2 · 为来源记录数,并非独立设施数。

电力对象与项目 · USA · eia860

77 Farm to Market Rd Hybrid(CSG)

发电设施 · 未确认

指标或条件原文数值口径、范围及阶段
Grid Voltage (kV)22.8 kV原始来源列定义 · 发电厂 · 未确认
基准日期 2025
依据 EV-05d8e6b4c5ae6118772609ff
原始来源详细字段
原始来源字段公开数值或条件
Utility ID64471
Utility Name77F2M WHAM8 Solar, LLC
Plant Code65055
Plant Name77 Farm to Market Rd Hybrid(CSG)
Street Address77 Farm to Market Rd
CityWareham
StateMA
Zip2571
CountyPlymouth
Latitude41.79455
Longitude-70.723394
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerNSTAR Electric Company
Transmission or Distribution System Owner ID54913
Transmission or Distribution System Owner StateMA
Grid Voltage (kV)22.8
Energy StorageY
坐标精度source_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:12237

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:12237

依据 EV-05d8e6b4c5ae6118772609ff
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0d00ef5467ae65f2c09bc1613b9d877591ea8222c57c7d08db823e19e16ea572

使用条件 US government public domain

来源各时点记录 · USA · eia860

77 Farm to Market Rd Hybrid(CSG)

发电厂 · 未确认

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID64471
Utility Name77F2M WHAM8 Solar, LLC
Plant Code65055
Plant Name77 Farm to Market Rd Hybrid(CSG)
Street Address77 Farm to Market Rd
CityWareham
StateMA
Zip2571
CountyPlymouth
Latitude41.79455
Longitude-70.723394
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerNSTAR Electric Company
Transmission or Distribution System Owner ID54913
Transmission or Distribution System Owner StateMA
Grid Voltage (kV)22.8
Energy StorageY
source_record_id2___Plant_Y2025.xlsx#Plant:12237

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:12237

依据 EV-05d8e6b4c5ae6118772609ff
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0d00ef5467ae65f2c09bc1613b9d877591ea8222c57c7d08db823e19e16ea572

使用条件 US government public domain

AI-DC KOREA MEMBER

登录

登录后继续查看当前页面。

G Google 登录K Kakao 登录

请选择注册时使用的Google或Kakao账户。

开始咨询 · 选择渠道