电力对象与项目 · USA · eia860

Alexis Solar, LLC

发电设施 · 未确认

指标或条件原文数值口径、范围及阶段
Grid Voltage (kV)12.47 kV原始来源列定义 · 发电厂 · 未确认
基准日期 2025
依据 EV-83cb8bad2e24bbc1b9fb416e
原始来源详细字段
原始来源字段公开数值或条件
Utility ID61677
Utility NameSol Systems
Plant Code64227
Plant NameAlexis Solar, LLC
Street Address1229 FM 755
CityEncino
StateTX
Zip78353
CountyBrooks
Latitude26.88913
Longitude-98.233324
NERC RegionTRE
Balancing Authority CodeERCO
Balancing Authority NameElectric Reliability Council of Texas, Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number19-1276-001
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerAEP Texas Central Company
Transmission or Distribution System Owner ID3278
Transmission or Distribution System Owner StateTX
Grid Voltage (kV)12.47
Energy StorageN
坐标精度source_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:11478

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:11478

依据 EV-83cb8bad2e24bbc1b9fb416e
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 db1232a4e23c38cadda0f0450e4515dc8fd557a26eea7c656e09a07cde0f20f5

使用条件 US government public domain

来源各时点记录 · USA · eia860

Alexis Solar, LLC

发电厂 · 未确认

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID61677
Utility NameSol Systems
Plant Code64227
Plant NameAlexis Solar, LLC
Street Address1229 FM 755
CityEncino
StateTX
Zip78353
CountyBrooks
Latitude26.88913
Longitude-98.233324
NERC RegionTRE
Balancing Authority CodeERCO
Balancing Authority NameElectric Reliability Council of Texas, Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number19-1276-001
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerAEP Texas Central Company
Transmission or Distribution System Owner ID3278
Transmission or Distribution System Owner StateTX
Grid Voltage (kV)12.47
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:11478

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:11478

依据 EV-83cb8bad2e24bbc1b9fb416e
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 db1232a4e23c38cadda0f0450e4515dc8fd557a26eea7c656e09a07cde0f20f5

使用条件 US government public domain

AI-DC KOREA MEMBER

登录

登录后继续查看当前页面。

G Google 登录K Kakao 登录

请选择注册时使用的Google或Kakao账户。

开始咨询 · 选择渠道