POWER & FACILITY EVIDENCE

电力与设施详细依据数据库

查看公开原文中的电力对象、合同观测、设施规格及关系。

这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。

当前条件 2条 · 当前页 1–2 · 为来源记录数,并非独立设施数。

电力对象与项目 · USA · eia860

Argonne National Laboratory CHP

发电设施 · 未确认

指标或条件原文数值口径、范围及阶段
Grid Voltage (kV)138 kV原始来源列定义 · 发电厂 · 未确认
基准日期 2025
依据 EV-4a2e98e4f8682a82b85b5179
原始来源详细字段
原始来源字段公开数值或条件
Utility ID60444
Utility NameArgonne National Laboratory
Plant Code60742
Plant NameArgonne National Laboratory CHP
Street Address9700 S. Cass Ave.
CityLemont
StateIL
Zip60439
CountyDuPage
Latitude41.716534
Longitude-87.970608
NERC RegionRFC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Name of Water SourceNA
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector3
Sector NameIPP CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerCommonwealth Edison Co
Transmission or Distribution System Owner ID4110
Transmission or Distribution System Owner StateIL
Grid Voltage (kV)138
Energy StorageN
Natural Gas LDC NameNICOR GAS
Natural Gas StorageN
Liquefied Natural Gas StorageX
坐标精度source_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:8367

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:8367

依据 EV-4a2e98e4f8682a82b85b5179
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e36ba61e4f24bf1368c988780797012602f45b5c207d92c59e248ba8eaf32cfa

使用条件 US government public domain

来源各时点记录 · USA · eia860

Argonne National Laboratory CHP

发电厂 · 未确认

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID60444
Utility NameArgonne National Laboratory
Plant Code60742
Plant NameArgonne National Laboratory CHP
Street Address9700 S. Cass Ave.
CityLemont
StateIL
Zip60439
CountyDuPage
Latitude41.716534
Longitude-87.970608
NERC RegionRFC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Name of Water SourceNA
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector3
Sector NameIPP CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerCommonwealth Edison Co
Transmission or Distribution System Owner ID4110
Transmission or Distribution System Owner StateIL
Grid Voltage (kV)138
Energy StorageN
Natural Gas LDC NameNICOR GAS
Natural Gas StorageN
Liquefied Natural Gas StorageX
source_record_id2___Plant_Y2025.xlsx#Plant:8367

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:8367

依据 EV-4a2e98e4f8682a82b85b5179
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e36ba61e4f24bf1368c988780797012602f45b5c207d92c59e248ba8eaf32cfa

使用条件 US government public domain

AI-DC KOREA MEMBER

登录

登录后继续查看当前页面。

G Google 登录K Kakao 登录

请选择注册时使用的Google或Kakao账户。

开始咨询 · 选择渠道