这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。
当前条件 3条 · 当前页 1–3 · 为来源记录数,并非独立设施数。
电力对象与项目 · USA · eia860mWestlake Power Station / CT1
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|
| Nameplate Capacity (MW) | 477.7 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-5e5bf94e0ab252a31665272e |
| Net Summer Capacity (MW) | 390 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-5e5bf94e0ab252a31665272e |
| Net Winter Capacity (MW) | 443.4 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-5e5bf94e0ab252a31665272e |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69426 |
| Plant Name | Westlake Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Calcasieu |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | CT1 |
| Unit Code | WL1 |
| Nameplate Capacity (MW) | 477.7 |
| Net Summer Capacity (MW) | 390 |
| Net Winter Capacity (MW) | 443.4 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 10 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.281105 |
| Longitude | -93.30189 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2090 |
上级设施或电厂记录
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1851
依据 EV-71a22e22569b3dd20b20e53b
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 adb54f31c72b9260039cb581883395d0283c882f7a922bdc5c41567eeb1ad9bf使用条件 US government public domain
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:2090
依据 EV-5e5bf94e0ab252a31665272e
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cbdb80acf73d6a957489d3a9b21d7af1ed4cd2fc71027c76468b192f73f9f9d5使用条件 US government public domain
来源各时点记录 · USA · eia860Westlake Power Station / CT1
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Utility ID | 11241 |
| Utility Name | Entergy Louisiana LLC |
| Plant Code | 69426 |
| Plant Name | Westlake Power Station |
| State | LA |
| County | Calcasieu |
| Generator ID | CT1 |
| Technology | Natural Gas Fired Combined Cycle |
| Prime Mover | CT |
| Unit Code | WL1 |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | N |
| Nameplate Capacity (MW) | 477.7 |
| Nameplate Power Factor | 0.85 |
| Summer Capacity (MW) | 390 |
| Winter Capacity (MW) | 443.4 |
| Status | P |
| Effective Month | 10 |
| Effective Year | 2030 |
| Current Month | 10 |
| Current Year | 2030 |
| Associated with Combined Heat and Power System | Y |
| Sector Name | Electric Utility |
| Sector | 1 |
| Previously Canceled | N |
| Energy Source 1 | NG |
| Multiple Fuels? | N |
| 原文状态 | P |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:1851 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1851
依据 EV-71a22e22569b3dd20b20e53b
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 adb54f31c72b9260039cb581883395d0283c882f7a922bdc5c41567eeb1ad9bf使用条件 US government public domain
来源各时点记录 · USA · eia860mWestlake Power Station / CT1
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69426 |
| Plant Name | Westlake Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Calcasieu |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | CT1 |
| Unit Code | WL1 |
| Nameplate Capacity (MW) | 477.7 |
| Net Summer Capacity (MW) | 390 |
| Net Winter Capacity (MW) | 443.4 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 10 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.281105 |
| Longitude | -93.30189 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| source_record_id | Planned:2090 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:2090
依据 EV-5e5bf94e0ab252a31665272e
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cbdb80acf73d6a957489d3a9b21d7af1ed4cd2fc71027c76468b192f73f9f9d5使用条件 US government public domain