这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。
当前条件 3条 · 当前页 1–3 · 为来源记录数,并非独立设施数。
电力对象与项目 · USA · eia860mBison Generation Station / CT1
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|
| Nameplate Capacity (MW) | 496 MW | 原始来源列定义 · 发电机 · (L) Regulatory approvals pending. Not under construction 基准日期 2026-08 依据 EV-00d52d87ae569f5a70d48a28 |
| Net Summer Capacity (MW) | 409 MW | 原始来源列定义 · 发电机 · (L) Regulatory approvals pending. Not under construction 基准日期 2026-08 依据 EV-00d52d87ae569f5a70d48a28 |
| Net Winter Capacity (MW) | 409 MW | 原始来源列定义 · 发电机 · (L) Regulatory approvals pending. Not under construction 基准日期 2026-08 依据 EV-00d52d87ae569f5a70d48a28 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 1307 |
| Entity Name | Basin Electric Power Coop |
| Plant ID | 69071 |
| Plant Name | Bison Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ND |
| County | Williams |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | CT1 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 496 |
| Net Summer Capacity (MW) | 409 |
| Net Winter Capacity (MW) | 409 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 2 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 48.327932 |
| Longitude | -103.3127 |
| 原文状态 | (L) Regulatory approvals pending. Not under construction |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1857 |
上级设施或电厂记录
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1644
依据 EV-b1e5d9d6ae3456ccb13e73b5
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51bdab79ebf7549d5a2979f3cabb12e192beeb5967faeea58fc83a7839dd5925使用条件 US government public domain
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1857
依据 EV-00d52d87ae569f5a70d48a28
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b88fe944c9db98594b1ebf852cfc9fbc826722cb48fc0d3fa471073518878ef7使用条件 US government public domain
来源各时点记录 · USA · eia860Bison Generation Station / CT1
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Utility ID | 1307 |
| Utility Name | Basin Electric Power Coop |
| Plant Code | 69071 |
| Plant Name | Bison Generation Station |
| State | ND |
| County | Williams |
| Generator ID | CT1 |
| Technology | Natural Gas Fired Combined Cycle |
| Prime Mover | CT |
| Unit Code | CC1 |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | N |
| Nameplate Capacity (MW) | 496 |
| Nameplate Power Factor | 0.85 |
| Summer Capacity (MW) | 409 |
| Winter Capacity (MW) | 409 |
| Status | L |
| Effective Month | 2 |
| Effective Year | 2029 |
| Current Month | 2 |
| Current Year | 2029 |
| Associated with Combined Heat and Power System | N |
| Sector Name | Electric Utility |
| Sector | 1 |
| Previously Canceled | N |
| Energy Source 1 | NG |
| Multiple Fuels? | N |
| 原文状态 | L |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:1644 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1644
依据 EV-b1e5d9d6ae3456ccb13e73b5
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51bdab79ebf7549d5a2979f3cabb12e192beeb5967faeea58fc83a7839dd5925使用条件 US government public domain
来源各时点记录 · USA · eia860mBison Generation Station / CT1
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 1307 |
| Entity Name | Basin Electric Power Coop |
| Plant ID | 69071 |
| Plant Name | Bison Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ND |
| County | Williams |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | CT1 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 496 |
| Net Summer Capacity (MW) | 409 |
| Net Winter Capacity (MW) | 409 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 2 |
| Planned Operation Year | 2029 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 48.327932 |
| Longitude | -103.3127 |
| 原文状态 | (L) Regulatory approvals pending. Not under construction |
| source_record_id | Planned:1857 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1857
依据 EV-00d52d87ae569f5a70d48a28
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b88fe944c9db98594b1ebf852cfc9fbc826722cb48fc0d3fa471073518878ef7使用条件 US government public domain