电力对象与项目 · USA · eia860mCedar Bayou 5 / 5
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|
| Nameplate Capacity (MW) | 721 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-bc2d14f6c8880caa412f2793 |
| Net Summer Capacity (MW) | 674 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-bc2d14f6c8880caa412f2793 |
| Net Winter Capacity (MW) | 697 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-bc2d14f6c8880caa412f2793 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 66975 |
| Entity Name | Cedar Bayou 5 LLC |
| Plant ID | 68606 |
| Plant Name | Cedar Bayou 5 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Chambers |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 5 |
| Unit Code | 5 |
| Nameplate Capacity (MW) | 721 |
| Net Summer Capacity (MW) | 674 |
| Net Winter Capacity (MW) | 697 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CS |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 29.751132 |
| Longitude | -94.92114 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1638 |
上级设施或电厂记录
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1431
依据 EV-2b0e4d04585f21e73369de5b
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c6174aa85bdd3e24e25cbc5d3a60633f04ff8c506b33e0e794a9ed0526d7d254使用条件 US government public domain
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1638
依据 EV-bc2d14f6c8880caa412f2793
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 28dec269d91c503113f6b0751a78ae0fccd322be7478397ca7b45c4dda20aac4使用条件 US government public domain
来源各时点记录 · USA · eia860Cedar Bayou 5 / 5
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Utility ID | 66975 |
| Utility Name | Cedar Bayou 5 LLC |
| Plant Code | 68606 |
| Plant Name | Cedar Bayou 5 |
| State | TX |
| County | Chambers |
| Generator ID | 5 |
| Technology | Natural Gas Fired Combined Cycle |
| Prime Mover | CS |
| Unit Code | 5 |
| Ownership | S |
| Duct Burners | Y |
| Can Bypass Heat Recovery Steam Generator? | N |
| RTO/ISO LMP Node Designation | CBY5_CC1 |
| RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERC | CBY5_CC1 |
| Nameplate Capacity (MW) | 721 |
| Nameplate Power Factor | 0.9 |
| Summer Capacity (MW) | 674 |
| Winter Capacity (MW) | 697 |
| Status | U |
| Effective Month | 8 |
| Effective Year | 2028 |
| Current Month | 8 |
| Current Year | 2028 |
| Sector Name | IPP Non-CHP |
| Sector | 2 |
| Previously Canceled | N |
| Energy Source 1 | NG |
| Multiple Fuels? | N |
| 原文状态 | U |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:1431 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1431
依据 EV-2b0e4d04585f21e73369de5b
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c6174aa85bdd3e24e25cbc5d3a60633f04ff8c506b33e0e794a9ed0526d7d254使用条件 US government public domain
来源各时点记录 · USA · eia860mCedar Bayou 5 / 5
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 66975 |
| Entity Name | Cedar Bayou 5 LLC |
| Plant ID | 68606 |
| Plant Name | Cedar Bayou 5 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Chambers |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 5 |
| Unit Code | 5 |
| Nameplate Capacity (MW) | 721 |
| Net Summer Capacity (MW) | 674 |
| Net Winter Capacity (MW) | 697 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CS |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 29.751132 |
| Longitude | -94.92114 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| source_record_id | Planned:1638 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1638
依据 EV-bc2d14f6c8880caa412f2793
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 28dec269d91c503113f6b0751a78ae0fccd322be7478397ca7b45c4dda20aac4使用条件 US government public domain