Bethlehem Power Plant / CTG3
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 127 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-e366fdec785d7f5be0d34ee9 |
| Net Summer Capacity (MW) | 125 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-e366fdec785d7f5be0d34ee9 |
| Net Winter Capacity (MW) | 125 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-e366fdec785d7f5be0d34ee9 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 56607 |
| Entity Name | Calpine Bethlehem LLC |
| Plant ID | 55690 |
| Plant Name | Bethlehem Power Plant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Northampton |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | CTG3 |
| Unit Code | 1234 |
| Nameplate Capacity (MW) | 127 |
| Net Summer Capacity (MW) | 125 |
| Net Winter Capacity (MW) | 125 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 12 |
| Operating Year | 2002 |
| Status | (OP) Operating |
| Latitude | 40.6175 |
| Longitude | -75.3147 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:12386 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:12387
依据 EV-ff8a965f81909b81000904d8资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d94bb285ecc15185eefc9c03de57bcf92727e2a794e39f8ced7aa904f396df73
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:12386
依据 EV-e366fdec785d7f5be0d34ee9资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c