电力对象与项目 · USA · eia860m

Mt Pleasant / 1

发电机 · 备用待机

指标或条件原文数值口径、范围及阶段
Nameplate Capacity (MW)2 MW原始来源列定义 · 发电机 · (SB) Standby/Backup: available for service but not normally used
基准日期 2026-08
依据 EV-375e97f2da85d2c45a6314f3
Net Summer Capacity (MW)2 MW原始来源列定义 · 发电机 · (SB) Standby/Backup: available for service but not normally used
基准日期 2026-08
依据 EV-375e97f2da85d2c45a6314f3
Net Winter Capacity (MW)2 MW原始来源列定义 · 发电机 · (SB) Standby/Backup: available for service but not normally used
基准日期 2026-08
依据 EV-375e97f2da85d2c45a6314f3
原始来源详细字段
原始来源字段公开数值或条件
Entity ID13038
Entity NameCity of Mt Pleasant - (IA)
Plant ID1166
Plant NameMt Pleasant
Google MapMap
Bing MapMap
Plant StateIA
CountyHenry
Balancing Authority CodeAECI
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month2
Operating Year2002
Status(SB) Standby/Backup: available for service but not normally used
Latitude40.971826
Longitude-91.55122
原文状态(SB) Standby/Backup: available for service but not normally used
坐标精度source_precision_not_independently_surveyed
source_record_idOperating:1859

上级设施或电厂记录

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 2条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 3_1_Generator_Y2025.xlsx#Operable:1852

依据 EV-a3d672155c921304855189bf
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 66c1729e74c0294215ada6c3d4e388039a450a8278f191f0466fd21e38389d4f

使用条件 US government public domain

eia860m ↗

数据来源 2026-08 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 Operating:1859

依据 EV-375e97f2da85d2c45a6314f3
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 61a1a54b7e454845da2336311acb3f8e3cb0b6ab8e58975c76659567b9b957cd

使用条件 US government public domain

来源各时点记录 · USA · eia860

Mt Pleasant / 1

发电机 · 备用待机

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID13038
Utility NameCity of Mt Pleasant - (IA)
Plant Code1166
Plant NameMt Pleasant
StateIA
CountyHenry
Generator ID1
TechnologyPetroleum Liquids
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationAMIL.HEN_AMT_P
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCAMIL.HEN_AMT_P
Nameplate Capacity (MW)2
Nameplate Power Factor0.8
Summer Capacity (MW)2
Winter Capacity (MW)2
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusSB
Synchronized to Transmission GridY
Operating Month2
Operating Year2002
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
原文状态SB
source_record_id3_1_Generator_Y2025.xlsx#Operable:1852

上级设施或电厂记录

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 3_1_Generator_Y2025.xlsx#Operable:1852

依据 EV-a3d672155c921304855189bf
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 66c1729e74c0294215ada6c3d4e388039a450a8278f191f0466fd21e38389d4f

使用条件 US government public domain

来源各时点记录 · USA · eia860m

Mt Pleasant / 1

发电机 · 备用待机

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Entity ID13038
Entity NameCity of Mt Pleasant - (IA)
Plant ID1166
Plant NameMt Pleasant
Google MapMap
Bing MapMap
Plant StateIA
CountyHenry
Balancing Authority CodeAECI
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month2
Operating Year2002
Status(SB) Standby/Backup: available for service but not normally used
Latitude40.971826
Longitude-91.55122
原文状态(SB) Standby/Backup: available for service but not normally used
source_record_idOperating:1859

上级设施或电厂记录

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860m ↗

数据来源 2026-08 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 Operating:1859

依据 EV-375e97f2da85d2c45a6314f3
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 61a1a54b7e454845da2336311acb3f8e3cb0b6ab8e58975c76659567b9b957cd

使用条件 US government public domain

AI-DC KOREA MEMBER

登录

登录后继续查看当前页面。

G Google 登录K Kakao 登录

请选择注册时使用的Google或Kakao账户。

开始咨询 · 选择渠道